News of 2026
Receipt of Order from Shiga Prefecture for "Electric Equipment Construction at Northeast Lake Biwa Purification Center, Stage 34"
Overview of construction
1. Construction name
Electric Equipment Construction at Northeast Lake Biwa Purification Center, Stage 34
2. Contractee
Japan Sewage Works Agency
3. Contract date
February 18, 2026
4. Tendering method
Open tendering
5. Location
Matsubaracho, Hikone City and Iso, Maibara City, Shiga Prefecture
6. Contract amount
2,700,500,000 yen (including tax)
7. Contractor
METAWATER Co., Ltd.
8. Business overview
Power receiving and transforming equipment (Full set)
Water treatment operation equipment (Full set)
Sludge treatment operation equipment (Full set)
Monitoring and control equipment (Full set)
9. Project period
February 19, 2026, to March 14, 2029