News of 2024
Receipt of Order from Ibaraki for "Installation of New R6 Kasumigaura Water Supply Water Pipeline No. 2 Filtration Facility"
Overview of construction
1. Construction name
Installation of New R6 Kasumigaura Water Supply Water Pipeline No. 2 Filtration Facility
2. Contractee
The Kanto Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism (MLIT)
3. Contract date
July 9, 2024
4. Tendering method
Open tendering (general evaluation system)
5. Location
Mimura Jisaki, Ishioka City, Ibaraki Prefecture
6. Contract amount
3,707,000,000 yen (including tax)
7. Contractor
METAWATER Co., Ltd.
8. Business overview
?Fabrication and installation of river purification equipment: Full set
?Filtration equipment: Full set (filter media: 380 m3, upper screen: 20 sets, air washing devices: 20 sets, washing device: 80 sets)
?Water intake equipment: Full set
?Operation control equipment: Full set
?Instrumentation equipment: Full set
?DO supply equipment: Full set
9. Project period
From July 10, 2024, to February 26, 2027