News of 2021
Receipt of Order from Ibaraki for "(Obligation) Southern Ibaraki rehabilitation Prefecture unit No. 03-30-003-6-002 Ozone catalytic tank machinery construction"
The advanced oxidation process (AOP) system installed in this construction work will be a treatment technology that combines ozone treatment and hydrogen peroxide, as a new solution for the mold smell of the drinking water source. This will be the first application to water treatment in Japan. The appropriate control of the ozone and hydrogen peroxide introduction will realize the decomposition of the high concentration mold smell, an improvement to the treatment efficiency in the low water temperature season, the suppression of the byproduct bromic acid generation, and a reduction of the burden on the activated carbon in later stage processing.
verview of construction
1. Construction name
(Obligation) Southern Ibaraki rehabilitation Prefecture unit No. 03-30-003-6-002 Ozone catalytic tank machinery construction
2. Contractee
Ibaraki Prefectural Government Public Enterprise Bureau
3. Contract date
September 30, 2021
4. Tendering method
Open tendering method (Comprehensive evaluation method)
5. Location
Kasumigaura water treatment plant (2972, Ooiwata, Tsuchiura City, Ibaraki Prefecture)
6. Contract amount
2,359,500,000 yen (including tax)
7. Contractor
METAWATER Co., Ltd.
8. Business overview
Ozone catalytic tank machinery construction¡¡¡¡Full set
Ozone generators¡¡¡¡Three units
Air source apparatus¡¡¡¡Three units
Cooling water devices¡¡¡¡Three units
Waste ozone treatment device¡¡¡¡Full set
Hydrogen peroxide injection equipment¡¡¡¡Full set
Advanced oxidation process (AOP) equipment control device¡¡¡¡Full set
9. Project period
October 1, 2021 to March 15, 2024